44
5.5.5 Inserting the CP3 Card
All important operating parameters such as the maximum steam capacity, the heating voltage, the
numberofbaseunitsaswellasthedifferentiationbetweenmainandextensionunitarepermanently
storedontheCP3Card.
Beforeyoustarttheelectricalinstallation,check whether the CP3 Card is installed.Ifitisnot,
check whether the type designation on the CP3 Card supplied corresponds with the type
designation on the data plate of the unit (the data plate is located above the type plate of the
unit).Ifthedesignationsmatch,placetheCP3Cardinthecardholderoncontrolprint.Thencover
thedataplateabovethetypeplatewiththedataplatesupplied(self-adhesive).
IfthetypedesignationontheCP3Cardandthedataplatedonotmatch,theCP3Cardmustnotbe
installed.Ifthisisthecase,contactyourCondairsupplier.
5.5.6 Notes on electric installation
– The electric installation must be carried out according to the wiring diagram in chapter 5.5.1 or
5.5.2andtheapplicablelocalregulations.Allinformationgiveninthecorrespondingwiringdiagram
mustbefollowedandobserved.
– All cables must be lead into the unit via the cable openings equipped with cable glands (e.g. op-
tion“PG-cablegland”).Thecablefortheheatingvoltagesupplymustbeleadintotheunitfrom
the bottom via the cable opening equipped with the clamp strap. Fix the cable with the clamp
strap.
– Makesurethecablesdonotscrubonanycomponents.
– Maximum cable length and required cross section per wire must be observed.
– Thesupplyvoltagesforheatingandcontrolmustmatchtherespectivevoltagesstatedinthe
wiring diagram.
5.5.7 Inspecting the electrical installation
Checkthefollowingpoints:
Dothesupplyvoltagesforheatingandcontrolcomplywiththerelevantvoltagesgiveninthe
wiringdiagram?
IsthecorrectCP3Cardinserted?
Arethevoltagesupplies(heatingandcontrolvoltage)correctlyfused?
Istheserviceswitch“Q..”installedinthesupplylinefortotheheatingandcontrolvoltage?
Areallcomponentscorrectlyconnectedaccordingtothewiringdiagram?
Areallconnectingcablesfastened?
Aretheconnectingcablesfreeoftension(passedthroughcableglands?)
Doestheelectricinstallationmeettheapplicablelocalregulationsforelectricinstallations?
Isthefrontpanelmountedandcorrectlyxedwiththetwoscrews?