EasyManua.ls Logo

Condair CP3 - 6.7.7 Activating;Deactivating fault current relay operation; 6.7.8 Setting the operation mode for multiple units

Condair CP3
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
6.7.7 Activating/Deactivating fault current relay operation
Settings
On/O Timer :Set
GFCI-Mode :On
Multi-Mode :Sequence
Power Limit :Set
Water Manag.:Set
Esc Set
Select “GFCI-Mode”inthesettingsmenu,thenpressthe<Set>key.
IntheupcomingmodicationdialogueselectwhetherornottheCondair
CP3isconnectedtoafaultcurrentrelayprotectedmainssupply.
Factorysetting: On
Options: On (mainssupplywithfaultcurrentrelayprotec-
tion)
Off (mainssupplywithoutfaultcurrentrelay
protection)
On/O Timer
Event 1 :06:00
Event 2 :22:00
Event 3 :--:--
Timer :On
Event 4 :--:--
Esc Set
Event 2
Time :22:00
Mode :On
Weekday :Mo-Fr
Esc Set
6.7.8 Setting the operation mode for multiple units
Settings
GFCI-Mode :On
Multi-Mode :Sequence
Water Manag.:Set
On/O Timer :Set
Remote Test :Set
Esc Set
Select “Multi-Mode” in the settings menu, then press the <Set> key.
Intheupcomingmodicationdialogueyoudeterminehowthedemanded
steam capacity is shared among the units.
Factorysetting: Sequence
Options: Sequence(sequentialloadsharing)
Parallel (evenloadsharing)
Note:ThissettingisavailableonlyonmainmoduleAofmultipleunits.
– On/Offtimeractivated:
Ifthetimerisactivated,uptoeightswitch-
ingpoints(events1-8)withdifferentOn/
Offeventscanbedened.
Eachswitchingpointisdenedbyaweek-
dayorweekdayrange,theswitchingpoint
and the operating mode.
Congurationnotes:
– thesettingsofaneventremainactiveuptothenextevent.
– the software does not check the plausibility of the timer settings.
Therefore,makesureyoursettingsmakesense.
– theOn/Offtimeroverridesallothertimers.
Notes on Multi-Mode settings
Sequence:thedemandisdistributedasfollows:therstcylinder(ModuleA)takes0–50%of
thedemandandthesecondcylinder(ModuleB)51–100%.Inordertoensurebalancedcylinder
operatinghourstheparameters“Seq.Rotation”and“Seq.Interval”mustbesetaccordinglyinthe
engineering level.
Parallel:Thedemandisdistributedevenlyonbothcylinders,i.e.withademandof50%both
cylindersworkingwith50%demand.

Table of Contents

Related product manuals