61
7.2 Maintenance list
To maintain operational safety the Condair CP3 steam humidier must be maintained at regular in-
tervals. This is differentiated between the first maintenance after approx. 500 operating hours
(I), steam cylinder maintenance after the yellow LED lights (II) and annual maintenance (III).
Below you will nd a summary of the work to be carried out for each of the three maintenance stages.
Components Interval Work to be done
I II III
Cleanable steam cylinder Type D.. X X X Clean steam cylinder and electrodes and check
for damage, replace if necessary. Note: The steam
cylinder must be replaced after a maximum operat-
ing time of 5,000 h.
Electrode plug X X X Check to see rmly positioned (remove cover and
tighten xing screw with hexagonal head socket
wrench).
Warning! This work should only be carried out by
an electrician.
Replacement steam cyl. type A.. X Remove and replace.
Drain pump X Remove, disassemble and clean, replace if neces-
sary.
Steam cylinder receptacle X Inspect, clean if necessary.
Inlet valve X Remove and clean lter insert, replace if neces-
sary.
Drain pipe and siphon X Inspect, clean if necessary (decalcify and rinse
out).
Steam installation X X Inspect steam and condensate hoses for cracks
and to see that they are correctly attached, replace
faulty hoses.
Water installation X X Inspect water hoses in the unit for cracks and to
see that they are correctly attached, replace faulty
hoses
Check supply pipe is tight, make tight if necessary.
Clean water lter, if available.
Electrical installation X X Check all cables in the unit are rmly positioned and
examine status of insulation.