EasyManua.ls Logo

Durst Omega 2 - Page 33

Durst Omega 2
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Omega 2 EOperation
The rell tank must be ventilated in order for it to empty fully. For
this purpose, the bleed tab on the bottom o f the rell tank must be
cut open.
1
Fig. 12 Cutting open bleed tab
7. Cut open bleed tab (1).
Open quick connectors!
Soiling and harden ing of ink
Do not remove rell tank from the quick connector after relling.
If a quick connector is not being u sed: Close quick connector w ith
provided cover cap.
8. Leave rell container connected to the quick connector and in the loading
compartment until the next change.
Relling of th e ink mu st be entered in the software on the Ink
Batch Tracking tab so that the ink-level indicator matches the
actual ink level.
9. Create a new entry in the software on the Ink Batch Tracking tab.
The ink-level indicator on the status line of the software is increased
by exactly 1 liter.
2004 2014 © Durst Pho totechn ik AG www.durst-online.co m , Omega 2 , Issued 07/201 4 33 / 91

Table of Contents

Related product manuals