EasyManua.ls Logo

Eaton Network-M3 - Restart Sequentially the IT Equipment on Utility Recovery

Eaton Network-M3
294 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Powering down/up applications (examples)
Servicing the Network Management Module – 187
Critical equipment is the last one to power down, their availability will be maximized and their shutdown will end 180s before
the end of backup time.
3. Set Group 2 to:Immediate off.
Non-priority equipmentimmediately shuts down when on battery for 10s to keep battery power for critical equipment.
4.3.3 Restart sequentially the IT equipment on utility recovery
4.3.3.1 Target
Restart the storage first (right after utility recovery), database servers next(2min after utility recovery) and applications last (3min
after utility recovery).

Table of Contents

Related product manuals