EasyManuals Logo

EVOCA Cafection Symbol User Manual

EVOCA Cafection Symbol
87 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
www.cafection.com 800-561-6162
68
DS2212NSA Rev. 1 2023-04
SERVICE & INSTALLATION MANUAL - Symbol
Cleaning and Sanitizing
8 PREVENTIVE MAINTENANCE
All important parts of the unit must be maintained as per the preventive maintenance schedule to honor
the warranty and to avoid possible defects. Adequate maintenance will extend the life of the coffee
machine and deliver a consistent high quality beverage.
The preventive maintenance schedule and instructions below must be followed to
honor the warranty.
8.1 Preventive Maintenance (PM) Schedule
All parts must be visually inspected upon each visit and cleaned as needed.
Inspection Preventive Maintenance See Section
Overflow Tray Weekly Inspection 8.3
Brew Group Assembly Monthly
25,000 cycles
or annually
8.4
Outlet Valves Quarterly 10,000 cycles 8.5
Hot Water Tank Quarterly 60,000 cycles 8.6
Grinder Quarterly 100,000 cycles 8.7
8.2 Recommended Tools for Servicing the Coffee Brewer
- #1 and #2 Phillips screwdrivers
- Flat-head screwdriver
- Adjustable wrench
- Wrench 1/4"
- Drive ratchet socket box 5/16" and 3/8"
Preventive Maintenance

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EVOCA Cafection Symbol and is the answer not in the manual?

EVOCA Cafection Symbol Specifications

General IconGeneral
BrandEVOCA
ModelCafection Symbol
CategoryCoffee Maker
LanguageEnglish

Related product manuals