Test Setup - Test Configurator, Timer, and System
112 MAX-800 Series
Interface
Interface
From the Test menu, tap Setup, Test Configurator, the interface block,
and the Interface tab.
LINK
An arrow is used to indicate the port link status (at the PCS level for parallel
interfaces): link up (green arrow), error or link down (red arrow), or
awaiting incoming data to provide a status (gray arrow).
Note: Refer to Ethernet on page 216, and Ethernet - PCS on page 219 for more
information on alarms.
For 100GE (4 Lanes) framed Ethernet interface:
RS-FEC check box when selected (default), enables the use of the
RS-FEC; ensure both ends of the circuit have the FEC enabled. The
RS-FEC check box should be selected when using a 100GBASE-SR4,
100G-CWDM4, or 100G AOC transceiver but may be cleared for testing
purposes. Not available when the PHY Type is set to LR4/ER4 (see
page 72).