EasyManuals Logo

GE LOGIQ P7 Service Manual

GE LOGIQ P7
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #163 background imageLoading...
Page #163 background image
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 4 - Functional Checks 4-23
4-3-6 Peripheral Checks
4-3-6-1 DVR Test (if equipped)
Required: Blank [DVD+RW] media.
1) Make sure the tab menu of “Video” is found on the right-most touch panel tab. If not found, go to
“Utility” -> “Application” -> “Setting” and check “Show video Tab”.
2) Insert DVD+RW. Go to DVR Touch Panel menu.
3) Press “REC-Standby” to go stand-by.
4) Start Recording. Perform image scanning including Doppler sound.
5) Stop Recording.
6) Exit from stand-by.
7) Play.
8) Verify that Recorded image and sound can be played back.
NOTE: LOGIQ P9/P7 support USBHDD file capture. and this menu can select in
"
Utility
" "
System
"
"
Peripherals
"
tab. The recorded data can play on your target PC. The support video format mpeg-2 and
h.264 and it depend on codec on your PC of operation system. If you cannot play in window media
player, you should be download video codec or recommend use VLC media player(http://
www.videolan.org/).
4-3-6-2 Black and White Printer Test
1) Print an image by pressing P button associated with BW Printer. (P key should be configured
correctly.)
2) Verify that image can be printed.
3) Verify that printed image has no distortion as compared the image on screen.
4-3-6-3 Color Printer Test
1) Print an image by pressing P button associated with Color Printer. (P key should be configured
correctly.)
2) Verify that image can be printed.
3) Verify that printed image has no distortion as compared the image on screen.
4-3-6-4 CD/DVD Read/WriteTest
1) Insert Blank CD/DVD Media into Optical Drive.
2) Go to Utility à System à Backup Restore. Select “CD/DVD” in “Media” list.
3) Select “User Define Configuration checkbox” in Backup and Press “Backup”.
4) Start backup into Media by pressing “OK” Button.
5) Verify that “Finished OK” message appears.
4-3-6-5 ECG Test
1) Connect a any probe. Select cardiac application like “Adult”. And start scan.
2) Verify that ECG timeline gets displayed on image area.
3) Enter CSD.
4) Select DIAGNOSTICS - Service Diag - ECG Test.
5) Verify diagnostics exhibit “PASS”.

Table of Contents

Other manuals for GE LOGIQ P7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P7 and is the answer not in the manual?

GE LOGIQ P7 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P7
CategoryMedical Equipment
LanguageEnglish

Related product manuals