EasyManua.ls Logo

GE LOGIQ P7

GE LOGIQ P7
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 3 - Setup Instructions 3-23
3-7-2-3 During a normal boot, you may observe
A) Power is distributed to Peripherals, Operator Panel (control panel), Monitor, Front-End and
Back-End Processor.
B) The Back-End Processor and rest of the scanner starts with the sequence listed in following steps:
1) “Boot Screen” is displayed.
2) Back-End Processor is turned ON and starts to load the software.
3) The Start Screen (LOGIQ?) is displayed on the monitor.
4) Start-up progress bars indicating software loading procedures, are displayed on the monitor,
as shown in Figure 3-11 below.Start-up progress bars indicating software loading procedures,
Figure 3-11 GE Healthcare wallpaper with progress bar (R1.x.x)
Figure 3-12 GE Healthcare wallpaper with progress bar (R2.x.x and later)

Table of Contents

Other manuals for GE LOGIQ P7

Related product manuals