GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 2 - Site Preparation 2-1
Chapter 2
Site Preparation
Section 2-1
Overview
2-1-1 Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ P9/
P7 ultrasound unit. Included are descriptions of the facility and electrical needs to be met by the
purchaser.
Table 2-1 Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-7