54 0000010291
001
4.4.4 Empty the hopper
1. Push the Hydraulics button.
2. Go to screen 1301 (Augers).
3. Touch and hold the Start icon until the last material is moved to the press
block.
4. Push the Production button.
5. Run the machine until the hopper is empty.
4.4.5 Stop production
1. Push the Production button.
2. Push the Hydraulics button. The hydraulic unit stops.
Warning!
When the hydraulic unit starts or stops the shutters of the cooler will open
or close. Do not put your fingers or any object between the shutters.