6.2 Activity matrix
The activity matrix gives an overview of the maintenance tasks.
Daily
40 hours
250 hours
Inspection Check Action See
Plates Scratches, burrs and
cracks
Repair or replace 4.3.1
Cleanliness equip-
ment
Contamination Clean, if necessary 5
Hydraulic oil level Level Add oil, if necessary -
Search for leaks -
Conveyor belt Damage Repair or replace 6.2.2
Pneumatic air pres-
sure
Pressure Adjust -
Condensation level Drain -
Safety devices Emergency stops
Cover switches
Repair or replace -
Machine assembled
correctly
Assembly Change, if necessary -
Inspection Check Action See
Plates Flatness Replace 4.3.1
Inside equipment Contamination Clean 5
Oil temperature hy-
draulic system
Temperature -
Oil level outfeed con-
veyor drive unit
Level Add oil, if necessary -
Search for leaks -
Chain outfeed con-
veyor
Wear Replace -
Tension Adjust -
Hydraulic system Leakage Repair or replace -
Pneumatic system Leakage Repair or replace -
Outfeed conveyor Wear Repair or replace 6.2.2
Tension Adjust 6.2.2
Inspection Check Action See
Bottom- and top
plate
Wear Repair or replace 4.3.2
Mechanical press
block seal
Leakage Repair or replace 6.2.8
Knockout unit Alignment Adjust 6.2.3
Press block guiding Wear Repair or replace 6.2.5