2.3 Pre-Operation Inspection
29
3
2
Chapter 2 Measurement Preparations
Before using the instrument the first time, verify that it operates normally to ensure
that the no damage occurred during storage or shipping. If you find any damage,
contact your authorized Hioki distributor or reseller.
2.3 Pre-Operation Inspection
Metal Exposed
No Metal Exposed
Inspect the voltage cords
Is the insulation of the voltage cord to be
used damaged, or is bare metal exposed?
1
Do not use if damage is
present, as you could re-
ceive an electric shock.
Contact your authorized
Hioki distributor or reseller
if you find any damage.
2
Inspect the clamp sensors
• Is a clamp cracked or damaged?
• Is the cable’s insulation damaged?
3
Inspect the AC adapter
• Is damage to the AC adapter evident?
• Is the power cord’s insulation damaged?
No
No
4
Yes
Inspect the instrument
Is damage to the instrument evident?
No
Inspection complete