See 3.6 ( p.30)
Installing the Instrument
Initial Instrument Preparations
See 3.2 ( p.26)
See 3.3 ( p.28)
See 3.7 ( p.30)
See 3.12 ( p.43)
See "Instrument installation" (p. 7)
Pre-Operation Inspection
Verifying Correct Wiring
Always perform these checks before connect-
ing, and when turning the power on.
Always execute zero adjustment before con-
necting to measurement objects.
(p. 41)
See 3.11 ( p.41)
Connecting to the Lines to be Measured
See 3.9 ( p.34) to 3.10 ( p.38)
Setting the wiring mode and current
sensors
See 3.8 ( p.33)
Turning Power On
See 3.4 ( p.29)
Rear side
Apply the appropriate adhesive labels to the
voltage cords and current sensors. Then bun-
dle the voltage cables together with the spiral
tubes.
Connecting the Voltage Measurement
Cables
Connecting the Current Sensors
Connecting the Power Cord
For best precision, allow at least 30 minutes
warm-up before executing zero adjustment and
measuring.
Configure current sensor phase correction to
facilitate more precise measurement.