EasyManua.ls Logo

Hioki PW3390 - Page 35

Hioki PW3390
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.2 Initial Instrument Preparations
27
3
Chapter 3 Measurement Preparations
Procedure
1.
Hold two cable leads (one each red and black) side-by-side.
Start bundling from one end of the leads.
2.
Wind the spiral tube around the leads.
Wrap the two leads together with the spiral tube. The five supplied spiral
tubes should be applied with suitable spacing.
Red
Black
Spiral tube

Table of Contents

Other manuals for Hioki PW3390

Related product manuals