EasyManua.ls Logo

Honeywell ACUIX - Switch Settings

Honeywell ACUIX
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Document 800-05662V1 Rev A 3
04/11
2
Installing the Scan Assembly
This chapter contains the following sections:
Preparing to Install the Scan Assembly, page 3
Installing the Scan Assembly, page 8
Installing the Bubble, page 9
Preparing to Install the Scan Assembly
The dome housing must be completely installed prior to installing the scan
assembly and bubble. The ACUIX™ Indoor and Outdoor Housings Installation
Guide (800-04558) provides instructions for installing the housing.
Note The instructions in this chapter assume that the housing has already
been installed, as well as all of the power, video, and telemetry (data)
connections.
Before you install the scan assembly in the housing, you must first set the dome
address, protocol, baud rate, and parity using the DIP switches located on the
circuit board on top of the scan assembly.
CAUTION
To prevent damage to the housing and scan assembly
circuit boards, follow standard industry precautions for electrostatic
discharge sensitive devices.

Table of Contents

Other manuals for Honeywell ACUIX

Related product manuals