EasyManua.ls Logo

HP rp7440 - Page 87

HP rp7440
195 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 3-5 Factory-Integrated Installation Checklist (continued)
CompletedIn-processProcedure
Verify system configuration and
set boot parameters
Set automatic system restart
Boot partitions
Configure remote login (if
required). See Appendix B.
Verify remote link (if required)
Install non-factory, integrated
I/O cards (if required)
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable iCOD (if available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Account for tools
Dispose of parts and other items
Make entry in Gold Book
(recommended)
Customer acceptance and signoff
(if required)
Cabling and Power Up 87

Table of Contents

Other manuals for HP rp7440

Related product manuals