2 Installation Preparations
2.1 Preparing Tools and Instruments
This section lists the tools and instruments required for installation.
Table 2-1 General tools and instruments
Tool Name,
Specications, and Appearance
Protective gloves Marker Measuring tape (5
m)
Level
Step ladder (2
m)
Phillips insulated
torque screwdriver
(M4/M6/M8)
Flat-head
screwdriver (2–5
mm)
Torque wrench
Adjustable
wrench (6")
Socket wrench
M6/M8/M12
Hex key (5 mm) Laser locator
FusionModule2000-S Smart Modular Data Center
User Manual 2 Installation Preparations
Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd. 25