5.1.1.3.2 Settings Wizard
Procedure
Step 1 Set the language, time and date, network parameters, system parameters, and
battery parameters on the Settings Wizard screen.
NO TICE
Set system parameters with caution because the settings determine whether the
UPS can operate normally.
Set Single/Parallel after double check. Incorrect setting may
aect the normal
UPS operation.
Output voltage level refers to the line voltage level. Set it based on site
requirements.
Set Output frequency correctly; otherwise, loads may be
aected and the UPS
may not work properly.
Battery parameter settings are critical to battery maintenance, battery lifespan,
and UPS discharge time.
FusionModule2000-S Smart Modular Data Center
User Manual 5 Power-On Commissioning
Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd. 135