EasyManua.ls Logo

JDS Uniphase HST-3000 - Optical Ethernet Terminate Application; Monitor Applications; 10;100;1 G Electrical Ethernet Monitor Application

JDS Uniphase HST-3000
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1 Getting Started
Test applications
12
HST-3000 Ethernet Testing User’s Guide
100M Optical
Ethernet terminate
application
When running a terminate application for a 100M optical
signal, events on the receiving SFP port (R/T 2) are analyzed,
but they have no affect on the signal transmitted by the HST
(the transmitted signal is generated independent of the
received signal). Analysis is restricted to the R/T 2 port.
Figure 3 illustrates the signal path when running a terminate
application for a 100M optical signal.
Monitor
applications
Before running a monitor application, in addition to selecting
the Monitor/Thru application for the signal you are testing, you
must specify Monitor as the test type (as opposed to the Thru
type). The HST then analyzes the received signal.
10/100/1G
Electrical Ethernet
monitor
application
When monitoring electrical signals, the HST analyzes the
received signal on the R/T 1 RJ-45 port.
The HST does not pass the signal through to the transmitter,
as it does in when running an electrical Thru application (see
“10/100/1G Electrical Ethernet thru application” on page 15).
Figure 4 Terminate application: 100M optical signal
path

Table of Contents

Other manuals for JDS Uniphase HST-3000

Related product manuals