Chapter 3 Ethernet Testing
Configuring layer 2 Ethernet tests
64
HST-3000 Ethernet Testing User’s Guide
5 If you need to specify other settings for the test, use the
left and right arrow keys to go to the appropriate configu-
ration menu; otherwise, press the Home button to return
to the Summary Results screen.
The unit is configured to transmit a ramped load of traffic.
Stop Load(Drop) If you want to stop the
ramp from incrementing
when frames are dropped,
select:
Yes
If you do not want the
ramp to stop increment-
ing, select:
No
# Drop Frames
(If Stop Load(Drop) is Yes)
Enter the number of
frames that must be
dropped before the unit
stops incrementing the
ramp.
Stop Load(Pause) If you want to stop the
ramp from incrementing
when pause frames are
detected, select:
Yes
If you do not want the
ramp to stop increment-
ing, select:
No
# Pause Frames
(If Stop Load(Pause) is Yes)
Enter the number of
pause frames that must
be detected before the
unit stops incrementing
the ramp.
Setting Parameters