CHAPTER 5
Preparation Overview
•
Site Preparation Checklist for an ACX5000 Router on page 45
•
General Site Guidelines for an ACX Series Routers on page 46
•
Site Electrical Wiring Guidelines for an ACX Series Routers on page 47
•
Environmental Requirements and Specifications for an ACX5000 Router on page 48
•
Chassis Physical Specifications for an ACX5000 Router on page 49
•
Rack Requirements for an ACX5000 Router on page 49
•
Cabinet Requirements for an ACX5000 Router on page 50
•
Clearance Requirements for Airflow and Hardware Maintenance for an ACX5000
Router on page 51
Site Preparation Checklist for an ACX5000 Router
The checklist in Table 20 on page 45 summarizes the tasks you need to perform when
preparing a site for an ACX5000 router installation.
Table 20: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Environment
“Environmental Requirements and
Specifications foran ACX5000 Router”
on page 48
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distancebetweenexternalpower
sources and router installation site.
“AC Power Specifications for an
ACX5000 Router” on page 53
Calculate the power consumption and
requirements.
Rack or Cabinet
45Copyright © 2015, Juniper Networks, Inc.