EasyManua.ls Logo

Lenze i750 - Preparation

Lenze i750
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparaon
Aer the mechanic
al assembly, the wiring begins with making the integrated electrical
connecons.
This is how you establish the integrated DC bus connecon.
Required tools
Screwdriver PH 3
1.Loosen screws.
2.Turn the swivel hook into posion.
3.Tighten the screws.
The DC bus connecon from the supply module to the last inverter in the network is
established.
PH 3
5 Nm
44.3 lb-in
This is how you establish the integrated pr
otecve earth connecon.
Required tools
Screwdriver PH 2
1.Loosen screws.
2.Turn the swivel hook into posion.
3.Tighten the screws.
4.Double the PE connecon on the le and right product of a network in accordance with the
standard.
5.Mount the shield connecon sheet.
The protecve earth connecon from the supplier to the last inverter in the network has been
established.
Ph2
2.5 Nm
(22.1 Ib-in)
Further data and in
formaon
4EMC-compliant installaon ^ 51
4St
andards and operang condions ^ 77
Electrical ins
tallaon
Preparaon
50

Table of Contents

Related product manuals