EasyManuals Logo

LSI 3ware 9750 User Manual

LSI 3ware 9750
380 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #275 background imageLoading...
Page #275 background image
Error and Notification Messages
www.lsi.com/channel/products 263
003B Rebuild paused
Event Type
Information
Cause
The rebuild operation is paused.
Rebuilds are normally paused for two (formerly ten) minutes after a system
first boots up and during non-scheduled times when scheduling is enabled.
Disabling or modifying the schedule with 3DM2 or CLI will allow the rebuild
to resume.
See Also
“Scheduling Background Tasks” on page 163
003C Initialize paused
Event Type
Information
Cause
The initialization is paused.
Initializations are normally paused for two (formerly ten) minutes after a
system first boots up. Initialization is also paused during non-scheduled times
when scheduling is enabled. Initializations follow the rebuild schedule.
Action
If you want the initialize to resume, you can disable or modify the schedule
through 3DM2 or CLI.
See Also
“Viewing Current Task Schedules” on page 165
“About Initialization” on page 146

Table of Contents

Other manuals for LSI 3ware 9750

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LSI 3ware 9750 and is the answer not in the manual?

LSI 3ware 9750 Specifications

General IconGeneral
BrandLSI
Model3ware 9750
CategoryController
LanguageEnglish

Related product manuals