25 Select the Blue Play Button to continue the test
26 After completion of the ratio test, the MVCT will take all the measurements and build a test report.
This test report will be automatically displayed.
Figure 103 Sample VT Test Report
7.2 Testing VT Ratio and Phase
1. Refer to the safety instructions first before use of the equipment.
2 Verify the Power ON/OFF switch is OFF. Power the test set from a suitable source
of power (95-125 or 195-265 V50/60 Hz).
3 Connect the ground wing nut to a suitable ground.
WARNING
There is always the possibility of voltages being induced at the terminals of a test
specimen because of proximity to high voltage energized lines. A residual static voltage
charge may also be present at these terminals. Ground each terminal to be tested with a
safety ground stick, before making connections.