EasyManua.ls Logo

Mitsubishi F700 Series

Mitsubishi F700 Series
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
377
Outline dimension drawings
7
SPECIFICATIONS
Operation panel (FR-DU07)
Parameter unit (option) (FR-PU07)
2-M3 screw
Panel
Cable
Air-
bleeding
hole
FR-DU07
Operation panel connection connecto
r
(FR-ADP option)
<Outline drawing> <Panel cutting dimension drawing>
78
50
44
723 3
81
33
16
25
3.2max
72
44
21
20
22
27.8
6
80.3
(14.2)
2.5
50
(11.45)
25.05
135
83
*1
*1
*1
*1
67
51
40
56.8
57.8
26.5
4-R1
4-φ4 hole
(
Effective depth of the mounting
screws hole 5.0)
M3 screw *2
26.5
40
Air-bleeding
hole
<Outline drawing> <Panel cutting dimension drawing>
(Unit: mm)
*1 When installing the FR-PU07 on the enclosure, etc., remove screws
for fixing the FR-PU07 to the inverter or fix the screws to the FR-
PU07 with M3 nuts.
*2 Select the installation screws whose length will not exceed the
effective depth of the installation screw hole.

Table of Contents

Related product manuals