V5A51 -
Transmission
23E-5-31
48. Install the parking roller rod to the detent lever.
49. Install two new O-rings to the manual control shaft, and
assemble onto the transmission case together with the
detent lever and parking roller rod.
50. Install the pin.
51. Hammer in the spring pin so that its slit is perpendicular
to the axial direction of the manual control shaft.
AddedPWEE8920-I
E
Mar. 2000Mitsubishi Motors Corporation
Parking roller rod
Detent
lever
O-rings
Pin
Manual
control
shaft
Spring pin