Industrial gear units – Operating and Assembly Instructions
66 B 1050 en-1819
Pos: 14 8 /Anlei tung en/G etrieb e/4. In betri ebna hme/Ch eckli ste [B 1050] @ 3\ mod_1369303601985_388.docx @ 71603 @ 233 @ 1
4.11 Checklist
4.11.1 Obligatory
Checklist
Subject of test
Date
checked:
Information
see Section
Is any transportation damage or damage apparent?
Does the labelling on the type plate conform to the specifications?
Does the required configuration conform with the actual
installation?
7.2
Has the correct oil level for the version been checked?
Has the vent been fitted and activated?
Is the gear unit earthed?
Is the gear unit correctly aligned?
Is the gear unit installed without tension?
Are the external gear shaft forces within the permitted limits ?
Is the coupling between the gear unit and the motor correctly
installed?
Has the gear unit been checked with a test run?
Table 10: Obligatory checklist for commissioning