Checklist
Subject of test
Date
checked:
Information
see Section
Is the direction of rotation specified and checked?
Is the torque support correctly fitted?
Are contact guards fitted to rotating components?
Option FAN, CS2:
Is an adequate supply of air ensured?
4.4
Is the cooling water connected to the cooling unit or the cooling
coil and open?
Is the cooling unit connected to the gear unit?
Has the pressure switch been functionally connected?
Has the temperature monitor been functionally connected?
Has the shrink disk connection been checked for slippage?
Is the brake correctly adjusted?
Is the belt correctly tensioned?
Has the speed monitor been functionally connected?
Table 11: Optional checklist for commissioning