Site planning
Navigation
This section contains information about the following topics.
•
“Site planning overview” (page 19)
• “DAP deployment rules and requirements” (page 27)
•
“Deployment tool” (page 52)
•
“Using the deployment tool” (page 62)
•
“DECT Deployment Kit 2” (page 64)
•
“DAP deployment” (page 67)
•
“Correct audio quality problems” (page 71)
•
“Single and multiple floor deployment” (page 72)
•
“Reengineer cells for high traffic areas” (page 83)
•
“Cell division requirements in special cases” (page 92)
•
“High handset density deployment” (page 95)
•
“Deployment review” (page 97)
Site planning overview
The site planning process is an information gathering process that begins
with a site survey and ends with deploying SIP DECT. The information
received in the site survey determines customer requirements and the
number of cells required to support traffic.
This section contains information about a key piece of deployment
equipment, the DECT Radio Deployment Tool. Deployment is the process
of locating basestations at the site. For general information about the
deployment process, see “DAP deployment rules and requirements”
(page 27). For more information about how to prepare equipment for
deployment, see “Prepare the tool for deployment” (page 54).