EasyManua.ls Logo

Omron i4L Series - A-1 Unpacking and Inspecting the Robot; A-1-1 before Unpacking the Robot; A-1-2 Unpacking the Robot; Before Unpacking the Robot

Omron i4L Series
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-1
Unpacking and Inspecting the Robot
This section provides information about unpacking and inspecting the robot.
A-1-1
Before Unpacking the Robot
Before unpacking the robot, carefully inspect all shipping containers for evidence of damage during
transit. Pay special attention to any tilt and shock indication labels on the exteriors of the containers.
Precautions for Correct Use
If any damage is detected before unpacking the robot, request that the carriers agent be
present when you unpack the container.
A-1-2
Unpacking the Robot
Use the following procedure to unpack the robot from its shipping container.
It is recommended to have the mounting surface prepared so the robot can be fastened immediately
after unpacking.
Additional Information
Retain all containers and packaging materials. These items may be necessary if there is any
apparent damage or relocation becomes necessary at a later date.
Precautions for Safe Use
The robot can be lifted by hand. Only use the base and inner link when lifting the robot. Never
maneuver the robot using the quill or flyover assemblies.
Precautions for Correct Use
If the robot has a bottom Primary Interface Panel orientation, do not temporarily set of the robot
upright on a flat surface because this can damange the Primary Interface Panel connectors.
Appendices
A-2
i4L Robots User's Manual (I658)

Table of Contents

Related product manuals