Returning the Server Module to Operation 119
2. (If needed) Remove the rear connector cover from the server module before
inserting it in the modular system.
3. Remove a filler panel from the modular system chassis slot you intend to use.
When the modular system is operating, you must fill every slot with a filler panel
or a server module within 60 seconds.
4. Hold the server module in a vertical position so that both ejector levers are on
the right (panel 1).
5. Slide the server module into the chassis (panel 2).
6. Close both latches simultaneously, locking the server module in the modular
system chassis (panel 3).
Once installed, the following server module activities take place:
■ Standby power is applied.
■ The front panel LEDs blink three times, then the green OK LED on the front
panel blinks for a few minutes.
■ Oracle ILOM is initialized on the server module SP and ready to use, but the
server module host is not started.
7. Start the server module host.
See “Power On the Host (Oracle ILOM)” on page 120.