9 Safe
Safe Safe
Safe Torque
TorqueTorque
Torque
Off (STO)
Off (STO)Off (STO)
Off (STO)
80
07-02-12-02-EN-V1215.doc / Type: 638
8.7 Step
:
Fieldbus Interface
Action, Function Anticipated Result
Remark,
Cause of Fault
Condition
6.1
Prerequisite:
Step
The overall system commissioning and the
communications test of the fieldbus interface
are
dependent upon the interface configuration of
the
drive. If there is not an options board
connected
then there are no more additional settings
required, and one can move on to Step 7.
6.3.
In the configurations menu, under „Fieldbus“
additional settings may be required,
depending
upon the connection interface for the fieldbus
board.
Additional information
concerning
start up procedure for the
fieldbus
interface connection can be
found
in the handbook about the
Options
Board.
On to Step
This manual was downloaded on www.sdsdrives.com
+44 (0)117 938 1800 - info@sdsdrives.com