5. Mirror box [disassembly procedure]
5.1 Focus screen
SW
contact (B21)
5.2 AM
Switch (B41)
5.3 Duality prevention lever (O-E91)
5.4 Removal
of
Main P.
C.
Board
(TJOO)
5.5 Shutter curtain operation lever
5.6 X
Switch (1230)
5.7 Release
of
curtain tension
5.8 Damper mech. (AO-El)
5.9 Curtain charge gear
(O-E80)
5.10
Curtain checker lever (E82)
5 .11
1
.,
and
2nd
curtain
5.12 Magnet plate (D59)
5.13 Mirror base plate
(0-Dl)
5.14 Bayonet seat (B2)
5.15 Focus screen adjusting plate (M3)
5.16 Viewfinder contact board
(O-T301)
5.17 Viewfinder positioning pin
(Mll)
5.18 Diaphragm coupler ring (O-K102)
5.
19
Anti-reflection sheet (D155)
5.20 Mirror sheet (O-D125)
5.21 Duality prevention coupler lever
(O-C25)
5.22 Other parts
6. Mirror box [assembly procedure]
6.1 Light sensor )0-1201)
6.2 Lock release pin (O-B14)
6.3 Light seal cushion (B50)
6.4 Damper plate (D132, D133)
6.5 Adhere Main mirror
(Ll)
6.6 Mirror sheet (0-D 125)
6.7 Mirror arm pedestal spring (D124)
6.8 Light seal curtain (B47)
6.9 Resistor
(KlOl)
6.10 Diaphragm coupler ring (O-Kl02)
6.11 Viewfinder positioning
pin
(Mll)
6.12 Viewfinder contact board (O-T301)
27340
6.13 Focus screen adjusting plate (M3)
6.14 Light se
al
string (BS)
6.15 Bayonet seat (B2)
6.16 Mirror base plate
(0-Dl)
6.17 Light seal tape D 130)
6.18 Magnet plate (D59)
6.19
FPC install plate (D37)
6.20 Wind-end
SW
contact (D72, D73)
6.21 Mirror stopper support spring (D67)
6.22
Shutter curtain operation lever
6.23 1
•• and
2nd
curtain
6.24 Curtain tension
6.25 Curtain checker lever (E82)
6.26 Curtain alignment (adjust)
6.27 Installing position
of
Damper block (adjust)
6.28 X
Switch (1230)
6.29 ES Magnet (adjust)
6.30 Mirror box operation (check)
6.31 Apply silicon
to
Shutter curtain operation
lever
6.32 Installing Main
P.
C.
Board (TlOO)
6.33 Shutter curtain position (check)
7. Mirror base plate (assembly procedure)
7.1 Mirror actuator arm
(0-Dll)
7.2 Restoring gear (D24)
7.3 Release spring (D44)
7.4 Mirror charge double gear
(O-D40)
7.5 Operation
of
Mirror base plate
(0-Dl)
(check)
8. Assembly
of
shutter curtain
8.7 Drawing
of
shutter curtain assembly
9. Main mirror
(Ll)
installing
10. Folding
of
Main P. C. Board
(TlOO)