EasyManua.ls Logo

Pentax 67 II - Installation of the 1 and 2 D Shutter Curtain; Shutter Curtain Alignment (Adjust); Tension of the Curtains

Pentax 67 II
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.23 Installation
of
the 1''
and
2"d
shutter
curtain
(Assembly)
NB: Install the curtains with the mirror box
is
un-charged state.
Sec [
8.
Curtain assembly J for details
on assembly
of
the curtain.
I)
O-E67 {Shaft
plate
A),
E93 (Shaft plate
retainer
screw),
E97 (Shaft plate E
retainer
screw)
Attach O-E67 section to the mirror box
and
fix with E93
and
E97.
2)
EBO
(Curtain
shaft
pedestal),
E93 (Shaft
plate
retainer
screw)
x2
Attach
El
I 0 to the mirror box and
fix with E93 x2
and
CNM 1.7 x3.0.
3) E68 (Shaft plate
B),
E93 (Shaft plate
retainer
screw)
Install E68 to the mirror
box
and
fix with E93
and
CNS 1.7 x2.5.
4) E69 (Shafl plate C),
E93 (Shaft plate
retainer
screw) x2
Install E69 section
to
the mirror box
and
fix with E93 x2.
6.24 Tension
of
the
curtains
,.
f-E93
I)
Loosen CNL-Dl.4x2.0
x2
of
the curtain installing section,
from zero tension
of
curtains, wind the both curtains 2 to 3
turns clockwise. and tighten CNL-D 1.4
x2.0 x2 temporar
y.
46170 27:340
CNM1
.7x3.0~
f -
EgJ
E93

Table of Contents

Related product manuals