6.32.4 O-E91 (Duality prevention lever assy.), E95 (Duality prevention lever spring), TlOO (S300
part)
1) lnstall E95, O-E91 on
sliaf1
of
O-E67
and
fastcn with CNL-F
l.4
x2.5.
2) Attach E95 spring to
E96
aud O-E91 as shown
iu
drawing.
3) Apply G-
21
all rouud O-E67.
4) luscrt tip
of
l-E91 into annature part
of
S300
and
fasten S300 part ofTlOO to mirror box with CNL-D 1.7 x3.5.
6.32.5
TlOO
(1'301
part),
O-J201 (Light sensor) soldering
1) Solder lead wires to TlOO
from
KlOl.
Black, Blue,
Brown
2) Solder 0-1201 (Light sensor)
and
TlOO flex.
2 soldering lands
3)
Solder 1230 (X contact)
and
TlOO flex.
a soldering land
4) Treat
lead wires (black, brown, blue)
under
Tl
00 flex.
6.33
Check:
Shutter
curtain
operation
[Tools]
95901-Kl
65 (23400K-E80-A)
NB: Owing to large diameter
of
bead
of
E79 (Selector shaft nut), inside
of
23400K-E80-A should be shaved
with a file.
1) Check alignment and parallelism
of
curtains.
Standard :
Curtain alignment :
gap
max. 0.1 mm
Overlapping: max.
0.3111111,
Slant: max. 0.3
mm
2) 2nd curtain drive-in amount
Standard:
52170
On
the inside mark-in line to
two mark-in line.
27340
Check
point :
*Curtain
alignment
*Overlapping
*Running-in
I wound upl
Check
point
*Parallel
*Slant
I
Mid.
of
Wound up I