EasyManua.ls Logo

Pentax 67 II - Check: Shutter Curtain Operation; O-E91;E95;T100; T100;O-J201 Soldering

Pentax 67 II
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.32.4 O-E91 (Duality prevention lever assy.), E95 (Duality prevention lever spring), TlOO (S300
part)
1) lnstall E95, O-E91 on
sliaf1
of
O-E67
and
fastcn with CNL-F
l.4
x2.5.
2) Attach E95 spring to
E96
aud O-E91 as shown
iu
drawing.
3) Apply G-
21
all rouud O-E67.
4) luscrt tip
of
l-E91 into annature part
of
S300
and
fasten S300 part ofTlOO to mirror box with CNL-D 1.7 x3.5.
6.32.5
TlOO
(1'301
part),
O-J201 (Light sensor) soldering
1) Solder lead wires to TlOO
from
KlOl.
Black, Blue,
Brown
2) Solder 0-1201 (Light sensor)
and
TlOO flex.
2 soldering lands
3)
Solder 1230 (X contact)
and
TlOO flex.
a soldering land
4) Treat
lead wires (black, brown, blue)
under
Tl
00 flex.
6.33
Check:
Shutter
curtain
operation
[Tools]
95901-Kl
65 (23400K-E80-A)
NB: Owing to large diameter
of
bead
of
E79 (Selector shaft nut), inside
of
23400K-E80-A should be shaved
with a file.
1) Check alignment and parallelism
of
curtains.
Standard :
Curtain alignment :
gap
max. 0.1 mm
Overlapping: max.
0.3111111,
Slant: max. 0.3
mm
2) 2nd curtain drive-in amount
Standard:
52170
On
the inside mark-in line to
two mark-in line.
27340
Check
point :
*Curtain
alignment
*Overlapping
*Running-in
I wound upl
Check
point
*Parallel
*Slant
I
Mid.
of
Wound up I

Table of Contents

Related product manuals