8.5 O-E42
(Isl
curtain
pipe),
ESO
(Curtain roller A),
E83
(Curtain shaft wheel),
EllO
(Curtain shaft pedestal)
1) Apply appropria1e
quan1i1y
of
L3 l oil
1o
shaf1
sec1ion
of
0-E42,
push down shaft and apply appropria1e
quan1i1y
of
L1 I oil.
Move
shaft section up and down and spread U
I.
2)
lusnt
F58 into O-E42
~haft
section and attach
to
El
IO.
Fix with screwdriver and attach
ES~.
O-E63
8.6 E69 (Shaft
plate
C)
1) Insert into O-E42 in the order
W8
t=O.l (-adj.),
ESO.
Align with shaft sections
of
O-E42 and O-E43,
attach
E69, insert W81=0.2 (-adj.), and fasten with LW20.
2.
Apply
appropriate quantity
of
L31 oil from side
of
LW20 attachment section to hole section
of
E69 bearing.
E69
installing
direction
~r--W8
t=0
.
2(-adj.)
~LW20
~
-
I
27:340
59170