EasyManua.ls Logo

Pentax 67 II - O-E41;O-E42;O-E43;E48;O-E49, Etc

Pentax 67 II
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2
0-FAI
(Curtain
pipe), O-E42 (1st
curtain
pipe), O-E43 (2nd
curtain
pipe),
E48
(Isl
curtain
shaft
A),
O-E49 (1st
curtain
shan
B), etc.
1) Remove any oil from ribbon atlachment section
of
O-E43.
2) Peel
off
hacking paper E54 on O-E59
aud
attach ribbons with low place on drnrn ramp section
of
O-E43
as
standard.
3) Rotate O-E43, wiud
off
ribbou,
and
se
.al.
4) Provisionally attach E48
and
O-E49 to
0-£15
and
remove any oil from E48 atlachment section
and
O-E49 attachment section.
5)
Peel
off
backing paper
E.54
on O-E63 side
and
attach ribbons with low place on drum ramp section
of
O-E49
as standard.
6) Rotate O-E35, wind
off
ribbon, and seal.
7) Remove any protrnding adhesive, etc.,
and
leave undisturbed for more than
12
hours.
8) Remove any oil from O-E41 ribbon attachment section.
9) Remove peeling paper
E.53
on O-E59 side
and
attach shutter with a low place on drnm ramp section
of
O-E41
as
standard.
10) Rotate O-E41, wind shutter
and
seal.
11) Remove
peeling paper E53 on O-E63 side
and
attach shutter in principle with low place on ramp section
of
O-E42 as standard.
12) Rotate
O-E42, wind
off
ribbon,
and
seal.
13) Remove any protrnding adhesive, etc.,
and
leave undisturbed for more than
12
hours.
27340
57170

Table of Contents

Related product manuals