8.2
0-FAI
(Curtain
pipe), O-E42 (1st
curtain
pipe), O-E43 (2nd
curtain
pipe),
E48
(Isl
curtain
shaft
A),
O-E49 (1st
curtain
shan
B), etc.
1) Remove any oil from ribbon atlachment section
of
O-E43.
2) Peel
off
hacking paper E54 on O-E59
aud
attach ribbons with low place on drnrn ramp section
of
O-E43
as
standard.
3) Rotate O-E43, wiud
off
ribbou,
and
se
.al.
4) Provisionally attach E48
and
O-E49 to
0-£15
and
remove any oil from E48 atlachment section
and
O-E49 attachment section.
5)
Peel
off
backing paper
E.54
on O-E63 side
and
attach ribbons with low place on drum ramp section
of
O-E49
as standard.
6) Rotate O-E35, wind
off
ribbon, and seal.
7) Remove any protrnding adhesive, etc.,
and
leave undisturbed for more than
12
hours.
8) Remove any oil from O-E41 ribbon attachment section.
9) Remove peeling paper
E.53
on O-E59 side
and
attach shutter with a low place on drnm ramp section
of
O-E41
as
standard.
10) Rotate O-E41, wind shutter
and
seal.
11) Remove
peeling paper E53 on O-E63 side
and
attach shutter in principle with low place on ramp section
of
O-E42 as standard.
12) Rotate
O-E42, wind
off
ribbon,
and
seal.
13) Remove any protrnding adhesive, etc.,
and
leave undisturbed for more than
12
hours.
27340
57170