20-16
Crusher Operation
Finishing Plant Start Up
1. Check that all items are running satisfactorily.
2. Ensure the plant is stable and without undue
vibration. If necessary, reposition the plant on
rm, level area with the full length of both tracks
in contact with the ground.
3. Check all other aspects of the plant are ready for
the introduction of material.