EasyManua.ls Logo

Powerscreen XA750S - Moving the Machine on the Tracks; Initial Preparation

Default Icon
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12-2
13
10
10
Moving the Machine [Fitted with ‘860’ controls]
Moving the machine on the tracks
1. The machine is manoeuvred with the tracks
using the umbilical control or the radio remote
control, if 󰘰tted.
2. Prepare the machine for moving, see preparing
to move.
Initial Preparation
3. Observe all safety warnings.
4. Start the engine, see engine starting.
5. Set operation mode to track.

Table of Contents