10-8
3
4
5
1
2
Preparing to Move Plant
Dirt Conveyor [If tted]
3. If tted, remove the securing pin from the
transport bracket to allow the dirt conveyor to
operate into the transport position.
4. Locate the dirt conveyor control bank.
5. Operate lever to fold the dirt conveyor for
transport.
1. Remove the end cover plate to prevent it from
being damaged when folding.
2. Remove the roller and roller nip guard.