EasyManua.ls Logo

Powerscreen XA750S - Adjusting Discharge Opening

Default Icon
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21-4
13
<-
7 8
Crusher Operation
1. Ensure the crusher is completely empty of
material.
4. Start the engine, see engine starting.
7. Operate the control lever upward to reduce the
discharge opening
5. DO NOT start any part of the plant.
6. The crusher must be stationary to make
adjustments.
Adjusting Discharge Opening
8. Operate the control lever downward to increase
the discharge opening.
2. Measure the distance to obtain the current
discharge opening, refer to measuring
discharge opening.
3. Observe all safety warnings.

Table of Contents