EasyManua.ls Logo

Powerscreen XA750S - Tracks

Default Icon
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24-5
47
Daily Plant Checks
EN
Tracks
8. Observe all safety warnings.
n WARNING
Refer to Safety Notices Section for relevant
warning and procedure
LOCKOUT
PLANT
13. Check the tension of the tracks, refer to
servicing of tracks.
9. Close down the plant and implement the lockout
procedure.
10. Check the track rollers and idler wheels for
possible leakage.
11. Check the surface of the track, rollers, idler
wheels, track shoes and drive sprockets for
wear and loose mounting bolts.
12. Clean out any heavy build up of material from
around the tracks.
14. Check the track frames for any damage

Table of Contents