33-2
43
Initial Checks
14. Check all liner 󰘰xings daily whilst liners settle
in, when the plant is new or if the liners have
been disturbed. This should be checked daily
until no adjustment is required.
15. Ensure that all under size feed [smaller than
the discharge setting] and oversize feed
[greater that 80% of the feed opening] is
removed prior to introduction into the crusher.
16. If the crusher has not been run for some time,
re-grease all the crusher bearings then run
empty for approximately 2 hours.
Feeder
17. Frequently check the oil levels in the vibrating
unit oil baths.
18. After 󰘰rst 8 hours of operation, change the
oil in the vibrating unit oil baths, see servicing
vibrating feeder.
19. Check the vibrating unit bearing temperatures
using a contact thermometer on the oil baths;
record for future reference and fault diagnosis.
Maximum acceptable temperature is 80°C
(176°F).
20. Ensure that the vibrating feeder unit is
operating before any material is introduced to
the plant.