EasyManua.ls Logo

Ricoh A-C2 - Page 48

Ricoh A-C2
345 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 January, 2001 BRIDGE UNIT INSTALLATION
1-31
Installation
7. If an optional finisher is to be installed, attach two mylars [A] to the bridge unit.
8. Remove the cover [B].
9. Install the bridge unit [C] (! x2).
10. Connect the bridge unit I/F harnesses [D] (# x2).
11. Install the connector cover [E].
12. Turn on the main switch and check the bridge unit operation (make sure that
there are no paper jams).
A688I402.WMF
B397I404.WMF
[A]
[B]
[C]
[D]
[E]

Table of Contents

Related product manuals