26 January, 2001 1000-SHEET FINISHER INSTALLATION
1-33
Installation
1.7.2 INSTALLATION PROCEDURE
!
CAUTION
Switch off the main machine and unplug its power cord before starting the
following procedure.
NOTE: The bridge unit (B397) and paper tray unit (A682) must be installed before
installing this finisher.
1. Unpack the finisher and remove the tapes and retainers.
A681I701.WMF
A681I702.WMF