EasyManua.ls Logo

Ricoh A-C2 - Page 56

Ricoh A-C2
345 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 January, 2001 TWO-TRAY FINISHER INSTALLATION
1-39
Installation
8. Install two trays [A] (! x1 each).
9. Connect the finisher cable [B] to the main machine below the right rear handle.
10. Turn on the main switch and check the finisher operation.
NOTE: When moving the finisher to a new location, if you wish to put the finisher
back in the original carton, change the DIP switch settings. See DIP
Switches in the finisher service manual.
B352I103.WMF
B352I106.WMF
[A]
[B]

Table of Contents

Related product manuals