Interval Maintenance work Personnel
Before commissio-
ning/regularly
Multilift II ESD lifting column/Multilift II telescope ESD:
Check the effectiveness of the electrical connection in the
lifting column before commissioning and afterwards during
operation, regularly within the scope of ESD monitoring.
Qualified electrician
Weekly Check the lifting column for soiling. If necessary, clean the
lifting column with a clean cloth.
Note: Do not use cleaning agents containing solvents!
Assembly staff
Monthly Inspect the motor’s electrical connections for mechanical
stress and a secure fit.
Qualified electrician
Check the lifting column for damage (visual inspection). Assembly staff
Once a year Carry out a safety inspection of the lifting column as per
EN 62353.
Qualified electrician
Check that the limit switches/end positions are working:
n For Mono versions:
Move the lifting column into the final positions in both
directions.
n For Synchro versions:
Carry out a reference run.
Assembly staff
After 100,000 opera-
ting hours
Multilift II impact lifting column:
Replace the lifting column after 100,000 impact loads with
maximum impulse.
Assembly staff
Maintenance plan
Maintenance and troubleshooting
Maintenance plan
20.02.2019 Lifting column Multilift I/Multilift II 109