EasyManua.ls Logo

Rohde & Schwarz R&S ZVA 8 - Page 97

Rohde & Schwarz R&S ZVA 8
813 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S
®
ZVA/ZVB/ZVT Reflection Measurements
1145.1084.12 2.5 E-1
The next dialog of the calibration wizard shows that only a single calibration standard
needs to be measured.
5. Click the box Short (m)... to initiate the measurement of the connected short
standard.
The analyzer performs a calibration sweep and displays a message box with a progress
bar. After completing the sweep the analyzer generates a short sound and a green
checkmark appears in the checkbox.
6. Click Apply to close the wizard, calculate and store the system error correction
data and apply them to the current measurement.
7. Remove the short standard and connect the DUT again.

Table of Contents

Related product manuals