EasyManua.ls Logo

Sartorius BioPAT Trace - Page 45

Sartorius BioPAT Trace
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BioPAT
®
Trace | Multi Trace Operating Instructions 45
Initial Installation
The inlet and outlet lines of the tubing set are packaged in foil bags and
labeled. The individual tubes are affixed with the following labels:
BUFFER Connection to the transport buffer
WASTE Connection to waste
Probe port 1 dialysis
Probe port 2 dialysis
Standard1 Standard1 Cover label for standard calibration solution 1
Standard2 Standard2 Cover label for standard calibration solution 2
CAUTION
Erroneous measurements due to tubing sets not being filled or only being
partly filled!
Before filling the tubing set, make sure that tubing is connected to all
solutions and that the vessels are sufficiently filled.
CAUTION
Erroneous measurements due to incorrect or no dilution!
The transport solution is delivered as a salt mixture or concentrate. Observe
the note for proper resolution/dilution on the packaging.

Table of Contents

Related product manuals